Know-Legal Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  3. Standard time (manufacturing) - Wikipedia

    en.wikipedia.org/wiki/Standard_time_(manufacturing)

    Standard time (manufacturing) In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [ 1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to ...

  4. List of NP-complete problems - Wikipedia

    en.wikipedia.org/wiki/List_of_NP-complete_problems

    The problem for graphs is NP-complete if the edge lengths are assumed integers. The problem for points on the plane is NP-complete with the discretized Euclidean metric and rectilinear metric. The problem is known to be NP-hard with the (non-discretized) Euclidean metric. [ 3]: ND22, ND23. Vehicle routing problem.

  5. NP-completeness - Wikipedia

    en.wikipedia.org/wiki/NP-completeness

    The concept of NP-completeness was introduced in 1971 (see Cook–Levin theorem ), though the term NP-complete was introduced later. At the 1971 STOC conference, there was a fierce debate between the computer scientists about whether NP-complete problems could be solved in polynomial time on a deterministic Turing machine.

  6. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method ( CPM ), or critical path analysis ( CPA ), is an algorithm for scheduling a set of project activities. [ 1 ]

  7. Tolerance analysis - Wikipedia

    en.wikipedia.org/wiki/Tolerance_analysis

    Tolerance analysis is the general term for activities related to the study of accumulated variation in mechanical parts and assemblies. Its methods may be used on other types of systems subject to accumulated variation, such as mechanical and electrical systems. Engineers analyze tolerances for the purpose of evaluating geometric dimensioning ...

  8. Engineering fit - Wikipedia

    en.wikipedia.org/wiki/Engineering_fit

    Engineering fits are generally used as part of geometric dimensioning and tolerancing when a part or assembly is designed. In engineering terms, the "fit" is the clearance between two mating parts, and the size of this clearance determines whether the parts can, at one end of the spectrum, move or rotate independently from each other or, at the other end, are temporarily or permanently joined.

  9. Bottom–up and top–down design - Wikipedia

    en.wikipedia.org/wiki/Bottom–up_and_top–down...

    Building blocks are an example of bottom–up design because the parts are first created and then assembled without regard to how the parts will work in the assembly. Top–down is a programming style, the mainstay of traditional procedural languages , in which design begins by specifying complex pieces and then dividing them into successively ...