Know-Legal Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Gantt chart - Wikipedia

    en.wikipedia.org/wiki/Gantt_chart

    A Gantt chart is a type of bar chart [4] [5] that illustrates a project schedule. [6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [4] [7] The width of the horizontal bars in the graph shows the duration of each activity. [7] [8] Gantt charts illustrate the start and finish dates of ...

  3. Lotus 1-2-3 - Wikipedia

    en.wikipedia.org/wiki/Lotus_1-2-3

    Lotus 1-2-3. Lotus 1-2-3 is a discontinued spreadsheet program from Lotus Software (later part of IBM ). It was the first killer application of the IBM PC, was hugely popular in the 1980s, and significantly contributed to the success of IBM PC-compatibles in the business market. [1]

  4. Standard time (manufacturing) - Wikipedia

    en.wikipedia.org/wiki/Standard_time_(manufacturing)

    Standard time (manufacturing) In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to cover ...

  5. Work breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Work_breakdown_structure

    Example from MIL-HDBK-881, which illustrates the first three levels of a typical aircraft system. A work-breakdown structure (WBS) in project management and systems engineering is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project management element that organizes the team's work ...

  6. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  7. Control chart - Wikipedia

    en.wikipedia.org/wiki/Control_chart

    Control charts are graphical plots used in production control to determine whether quality and manufacturing processes are being controlled under stable conditions. (ISO 7870-1) The hourly status is arranged on the graph, and the occurrence of abnormalities is judged based on the presence of data that differs from the conventional trend or deviates from the control limit line.

  8. Methods-time measurement - Wikipedia

    en.wikipedia.org/wiki/Methods-time_measurement

    Methods-Time Measurement, known by the abbreviation MTM, is a predetermined motion time system that is used to analyze the work methods to perform any manual operation or task and, as a product of that analysis, to set the standard time in which a worker should complete that task. MTM does not make use of a Stop Watch or Time Study and ...

  9. Time–distance diagram - Wikipedia

    en.wikipedia.org/wiki/Time–distance_diagram

    Layout. A time–distance diagram is a chart with two axes: one for time, the other for location. The units on either axis depend on the type of project: time can be expressed in minutes (for overnight construction of railroad modification projects such as the installation of switches) or years (for large construction projects); the location can be (kilo)meters, or other distinct units (such ...