Know-Legal Web Search

  1. Ad

    related to: assembly time chart example for construction jobs

Search results

  1. Results From The WOW.Com Content Network
  2. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method ( CPM ), or critical path analysis ( CPA ), is an algorithm for scheduling a set of project activities. [ 1 ]

  3. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  4. Exploded-view drawing - Wikipedia

    en.wikipedia.org/wiki/Exploded-view_drawing

    A physical exploded view made by arranging parts of a camera. An exploded-view drawing is a type of drawing, that shows the intended assembly of mechanical or other parts. It shows all parts of the assembly and how they fit together. In mechanical systems usually the component closest to the center are assembled first, or is the main part in ...

  5. Work breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Work_breakdown_structure

    The work breakdown structure provides a common framework for the natural development of the overall planning and control of a contract and is the basis for dividing work into definable increments from which the statement of work can be developed and technical, schedule, cost, and labor hour reporting can be established.

  6. Submittals (construction) - Wikipedia

    en.wikipedia.org/wiki/Submittals_(construction)

    A common example of a sample panel is a wall mock-up. This is a full size mock-up of a wall assembly and can include window, exterior veneers and waterproofing. The mock-up serves as both an aesthetic review, but also provides the contractors the opportunity to field test the assembly before full-scale assembly.

  7. Gantt chart - Wikipedia

    en.wikipedia.org/wiki/Gantt_chart

    A Gantt chart is a type of bar chart [ 4][ 5] that illustrates a project schedule. [ 6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [ 4][ 7] The width of the horizontal bars in the graph shows the duration of each activity. [ 7][ 8] Gantt charts illustrate the start and finish ...

  8. Design for manufacturability - Wikipedia

    en.wikipedia.org/wiki/Design_for_manufacturability

    Design for manufacturability (also sometimes known as design for manufacturing or DFM) is the general engineering practice of designing products in such a way that they are easy to manufacture. The concept exists in almost all engineering disciplines, but the implementation differs widely depending on the manufacturing technology.

  9. Flow process chart - Wikipedia

    en.wikipedia.org/wiki/Flow_process_chart

    The first structured method for documenting process flow, e.g., in flow shop scheduling, the flow process chart, was introduced by Frank and Lillian Gilbreth to members of ASME in 1921 as the presentation "Process Charts, First Steps in Finding the One Best Way to Do Work". [ 2] The Gilbreths' tools quickly found their way into industrial ...

  1. Ad

    related to: assembly time chart example for construction jobs