Know-Legal Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  3. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The critical path method ( CPM ), or critical path analysis ( CPA ), is an algorithm for scheduling a set of project activities. [ 1] A critical path is determined by identifying the longest stretch of dependent activities and measuring the time [ 2] required to complete them from start to finish. It is commonly used in conjunction with the ...

  4. Work breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Work_breakdown_structure

    The work breakdown structure provides a common framework for the natural development of the overall planning and control of a contract and is the basis for dividing work into definable increments from which the statement of work can be developed and technical, schedule, cost, and labor hour reporting can be established.

  5. Exploded-view drawing - Wikipedia

    en.wikipedia.org/wiki/Exploded-view_drawing

    A physical exploded view made by arranging parts of a camera. An exploded-view drawing is a type of drawing, that shows the intended assembly of mechanical or other parts. It shows all parts of the assembly and how they fit together. In mechanical systems usually the component closest to the center are assembled first, or is the main part in ...

  6. Building occupancy classifications - Wikipedia

    en.wikipedia.org/wiki/Building_occupancy...

    A-1 Buildings intended for the production and viewing of performing arts or motion pictures (theaters, concert halls). A-2 Buildings intended for food and/or drink consumption (restaurants). A-3 Buildings intended for worship, recreation or amusement and other assembly uses not otherwise classified. A-4 Buildings intended for viewing of indoor ...

  7. Flow process chart - Wikipedia

    en.wikipedia.org/wiki/Flow_process_chart

    The first structured method for documenting process flow, e.g., in flow shop scheduling, the flow process chart, was introduced by Frank and Lillian Gilbreth to members of ASME in 1921 as the presentation "Process Charts, First Steps in Finding the One Best Way to Do Work". [ 2] The Gilbreths' tools quickly found their way into industrial ...

  8. Gantt chart - Wikipedia

    en.wikipedia.org/wiki/Gantt_chart

    A Gantt chart is a type of bar chart [ 4][ 5] that illustrates a project schedule. [ 6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [ 4][ 7] The width of the horizontal bars in the graph shows the duration of each activity. [ 7][ 8] Gantt charts illustrate the start and finish ...

  9. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    An abbreviation used in parts lists (PLs, LMs, BoMs) in the quantity-per-assembly field when a discrete count is not applicable. For example, in an assembly with a bolted joint using four bolts, the PL quantity column will say "4" for the bolt PN, "4" for the nut PN, and "AR" for the liquid threadlocker that will be applied. AS