Know-Legal Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  3. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method ( CPM ), or critical path analysis ( CPA ), is an algorithm for scheduling a set of project activities. [ 1 ]

  4. Construction - Wikipedia

    en.wikipedia.org/wiki/Construction

    Construction is a general term meaning the art and science of forming objects, systems, or organizations. [ 1] It comes from the Latin word constructio (from com- "together" and struere "to pile up") and Old French construction. [ 2] To 'construct' is a verb: the act of building, and the noun is construction: how something is built or the ...

  5. Work breakdown structure - Wikipedia

    en.wikipedia.org/wiki/Work_breakdown_structure

    Example from MIL-HDBK-881, which illustrates the first three levels of a typical aircraft system [1] A work-breakdown structure (WBS) [2] in project management and systems engineering is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project management element that organizes the team's ...

  6. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    It may be the entity who first designed the part (that is, the ODA), but today it is also likely to be a designated successor entity, owing to mergers and acquisitions (M&A) activity (e.g., ODA company was bought by CDA company); contract letting (e.g., an Army engineering department ODA turns over the design activity to the prime contractor ...

  7. Time–distance diagram - Wikipedia

    en.wikipedia.org/wiki/Time–distance_diagram

    A time–distance diagram is a chart with two axes: one for time, the other for location. The units on either axis depend on the type of project: time can be expressed in minutes (for overnight construction of railroad modification projects such as the installation of switches) or years (for large construction projects); the location can be (kilo)meters, or other distinct units (such as ...

  8. Flow process chart - Wikipedia

    en.wikipedia.org/wiki/Flow_process_chart

    The first structured method for documenting process flow, e.g., in flow shop scheduling, the flow process chart, was introduced by Frank and Lillian Gilbreth to members of ASME in 1921 as the presentation "Process Charts, First Steps in Finding the One Best Way to Do Work". [ 2] The Gilbreths' tools quickly found their way into industrial ...

  9. Gantt chart - Wikipedia

    en.wikipedia.org/wiki/Gantt_chart

    A Gantt chart is a type of bar chart [ 4][ 5] that illustrates a project schedule. [ 6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [ 4][ 7] The width of the horizontal bars in the graph shows the duration of each activity. [ 7][ 8] Gantt charts illustrate the start and finish ...