Know-Legal Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Takt time - Wikipedia

    en.wikipedia.org/wiki/Takt_time

    Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.

  3. Precedence diagram method - Wikipedia

    en.wikipedia.org/wiki/Precedence_Diagram_Method

    The precedence diagram method (PDM) is a tool for scheduling activities in a project plan. It is a method of constructing a project schedule network diagram that uses boxes, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. It is also called the activity-on-node (AON) method. Key elements ...

  4. Standard time (manufacturing) - Wikipedia

    en.wikipedia.org/wiki/Standard_time_(manufacturing)

    Standard time (manufacturing) In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [ 1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to ...

  5. Maynard operation sequence technique - Wikipedia

    en.wikipedia.org/wiki/Maynard_Operation_Sequence...

    Maynard operation sequence technique. Maynard operation sequence technique (MOST)[ 1] is a predetermined motion time system that is used primarily in industrial settings to set the standard time in which a worker should perform a task. To calculate this, a task is broken down into individual motion elements, and each is assigned a numerical ...

  6. Gantt chart - Wikipedia

    en.wikipedia.org/wiki/Gantt_chart

    A Gantt chart is a type of bar chart [ 4][ 5] that illustrates a project schedule. [ 6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [ 4][ 7] The width of the horizontal bars in the graph shows the duration of each activity. [ 7][ 8] Gantt charts illustrate the start and finish ...

  7. Methods-time measurement - Wikipedia

    en.wikipedia.org/wiki/Methods-time_measurement

    Methods-Time Measurement is a predetermined motion time system that is used to analyze the work methods to perform any manual operation or task and, as a product of that analysis, to set the standard time in which a worker should complete that task. MTM does not make use of a stopwatch or time study and therefore also negates the need for pace ...

  8. Time–distance diagram - Wikipedia

    en.wikipedia.org/wiki/Time–distance_diagram

    A time–distance diagram is a chart with two axes: one for time, the other for location. The units on either axis depend on the type of project: time can be expressed in minutes (for overnight construction of railroad modification projects such as the installation of switches) or years (for large construction projects); the location can be (kilo)meters, or other distinct units (such as ...

  9. Critical path method - Wikipedia

    en.wikipedia.org/wiki/Critical_path_method

    The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. The critical path method ( CPM ), or critical path analysis ( CPA ), is an algorithm for scheduling a set of project activities. [ 1 ]